An Immediate Emergency test can be activated by following the procedure below on safetest enabled devices
At the distribution board you will need to turn the breaker on and off in the detailed sequence.
| 1 | Ensure power is connected to the unit and that the battery has at least 20% charge. |
| 2 | Switch the power OFF and ON three times (i.e. 3 power cycles). Start with a 20-second OFF period, then leave 3 seconds between each switch. A phone timer can assist with timing accuracy. |
| OFF 20 sec | ON 3 sec | OFF 3 sec | ON 3 sec | OFF 3 sec | ||||
| TOTAL: 32 SECONDS | ||||||||
| 3 | Once the power cycles are complete, the unit will automatically enter emergency test if the battery has enough charge. |
Comments
0 comments
Article is closed for comments.